|
Overall (short version 1)
Date: 25/08/08
Views: 385
|
Paradigm Control Box1
Date: 13/12/05
Views: 132
|
Paradigm Control Box2
Date: 13/12/05
Views: 143
|
F-R Relay with Resistor for Detector
Date: 14/12/05
Views: 129
|
Foam base 3
Date: 18/12/05
Views: 121
|
|
Inter Module Joins
Date: 25/08/08
Views: 210
|
Left end rear cuttings
Date: 25/08/08
Views: 164
|
Paradigm's Coaling Facility
Date: 20/12/05
Views: 151
|
Rear End of Potentiometers etc
Date: 13/12/05
Views: 114
|
Rocky Outcrop on Paradigm1
Date: 20/12/05
Views: 144
|
|
Rocky Outcrop on Paradigm2
Date: 20/12/05
Views: 107
|
Rocky Outcrop on Paradigm3
Date: 20/12/05
Views: 107
|
Transformer Box1
Date: 06/12/05
Views: 107
|
Transformer Box2
|
Cabling Laid in Wait for Signals
Date: 17/04/08
Views: 121
|
|
Freshly Laid Track Across Bridge
Date: 17/04/08
Views: 162
|
Front Left Control Panel
Date: 25/03/08
Views: 131
|
Front Right Control Panel
Date: 25/03/08
Views: 125
|
Newly Laid Track on Paradigm Still Waiting for the Glue to go off
Date: 25/03/08
Views: 129
|
Shunt Yard Control Panel
Date: 25/03/08
Views: 148
|
|
How to Make Track Stay When Glueing Down
Date: 23/02/08
Views: 133
|
Laying of Bridge Track Across Bridge
Date: 23/02/08
Views: 120
|
Signalling Board Installed in Paradigm
Date: 23/02/08
Views: 126
|
Laying of Bridge Track Across Bridge
Date: 23/02/08
Views: 104
|
Pinning Track to Bridge
Date: 23/02/08
Views: 120
|
|
Relaying Track Across a Joint on Paradigm
Date: 23/02/08
Views: 141
|
|
|
|
|